Avery Dennison Power Stacker Instruções de Operação Página 6

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 5
Unpacking the Stacker
After you unpack the stacker, you should have a 928 stacker, stacker
mounting plate, and power cord.
Installing the Stacker
In addition to the 928 stacker, your printer could also have the 938
verifier. Always install the knife before the stacker or verifier. Then install
the verifier (if necessary) and then the stacker. The printer and all
accessories must be installed on a level surface.
To install the stacker:
1. Turn off the printer.
2. Attach the stacker mounting plate to the knife.
Stacker mounting plate
1-2 Operating Instructions
Vista de página 5
1 2 3 4 5 6 7 8 9 10 11 ... 27 28

Comentários a estes Manuais

Sem comentários